TRIDENT demonstrates PTES upscaling for the Bełchatów–Szczerców open-pit mining complex in the Southern Łódź Basin, Poland — the largest open-pit mining complex in Europe with more than 3,500 ha, which is gradually being decommissioned between 2026 and 2038.
The project builds on operational experience from the PTES plants in Meldorf and Bracht (Germany) and the dedicated heat-loss and slope-stability PTES field laboratory in Rechlin (Germany), which is part of the research project Efficient Pit led by TRIDENT partner Solmax.
What we do
WP2System integration
WP2 develops sustainable and efficient concepts for the integration of PTES systems with renewable (thermal) energies for district and industrial heat provision in the Southern Łódź Basin. It reviews regional heat generation, transport and consumer infrastructure, identifies suitable target open-pit mines and their flooding schedules, quantifies feasible heat flows, storage energy and exergy balances, and elaborates the relevant patents and regulatory framework for PTES application in the target countries and other EU Member States.
WP3Model validation and monitoring design
WP3 develops conceptual and coupled site-specific numerical models for the thermo-hydraulic-chemical and geotechnical processes of planned PTES systems, accounting for thermal stratification, heat losses to sediments and the atmosphere, thermally induced hydrogeochemical reactions, changes in microbial communities and slope stability. Fibre-optic sensing for continuous temperature and strain measurements over long distances is investigated at the Rechlin field laboratory. WP3 also delivers an open-access, open-source simulation tool that allows developers, operators, mining authorities and regulators to quantify PTES efficiency, installation costs and heat losses as a basis for investment decisions and long-term planning.
WP4PTES system upscaling
WP4 assesses the feasibility of upscaling conventional PTES systems to open-pit mines in coal regions in transition. It develops economically efficient upscaling concepts based on generic PTES design elements, optimises storage concepts for diurnal and seasonal operation, identifies cost-efficient real-time monitoring concepts, and quantifies the carbon and socio-economic footprint of PTES through Life-Cycle Assessment.
WP5Integrated risk assessment
WP5 conducts an integrated environmental, socio-economic and technical risk assessment of PTES in open-pit mines. It includes thermal impact analyses on adjacent groundwater aquifers, geotechnical stability analyses for different operating modes, and thermally controlled laboratory experiments with site-specific groundwater and sediment samples to investigate effects on the local microbiological community. Site-specific experts identify, classify and mitigate the most relevant risks.
WP6Dissemination
WP6 harmonises the dissemination and exploitation activities of the project's main results, communicates them to the broad public, establishes contacts with stakeholders, evaluates market potentials, and elaborates best practices and recommendations (technical, operational, legal and economic) for decision makers, operators, stakeholders and mining authorities.